2,700-Bed Student Housing North Complex
San Luis Obispo, California

2,700-Bed Student Housing North Complex, San Luis Obispo, California

Cal Poly's Master Plan (adopted in March 2001) calls for the construction of residential communities to more than double housing available for students living on campus. The Student Housing North Complex will be the largest single construction project in the history of the CSU system at $299 million in bonds. This 2,700-bed housing complex will include three residential neighborhood areas on 30 acres north of Brizzolara Creek. The size of this project offers Cal Poly a unique opportunity to create a twenty-first century living and learning community. Its program components and physical design can embody the key values of the Cal Poly Master Plan, particularly with respect to establishing an atmosphere that is student-centered, stimulating, socially supportive and environmentally responsible. The complex includes two parking structures totaling 1,900 parking spaces, commercial areas with retail and food service space as well as a recreation center with a swimming pool. The apartment units will offer full kitchens, laundry areas, study areas, utilities including high-speed internet access. The design team, headed by Clark Construction, was awarded this project as the result of a design/build competition. Cannon Associates was chosen to provide civil engineering services for the project. The scope of work includes the preparation of grading, drainage, improvement, and on-and off-site utility plans. Cannon Associates will also assist with environmental permitting and achieving LEED certification for the complex. The project is scheduled to begin in late fall 2005 and will open in two phases beginning in 2008.

For up to the minute coverage of the construction site, click here

2,700-Bed Student Housing North Complex, San Luis Obispo, California Cal Poly Student Housing Project
San Luis Obispo, California

Cal Poly Housing Project

With hundreds of new students on the California Polytechnic State University campus each year, this 200-room/800-bed student housing facility was in high demand. Constructing 29 buildings and a commons building on a steep hillside in San Luis Obispo created design challenges. The final design incorporated the surrounding natural landscape with stepped foundations and retaining walls to minimize site disturbance. Cannon Associates was selected to provide civil and structural engineering, surveying, and permitting services to the project architect. The scope of work included plans, specifications, and cost estimates for grading, drainage, an on-site storm water detention basin, hot and cold water systems for heating and cooling, plans and specifications for street improvements; including parking along the street, curb, and gutter, and plans specifications and calculations for twelve foot headwalls needed to support the street improvements. Additionally, Cannon Associates prepared structural design for stepped foundations and retaining walls to mitigate the site’s steep terrain; along with designs of concrete abutments for a 32-foot by 6-foot concrete and steel pedestrian bridge; a topographic survey; and permit processing and coordination with Army Corps, Fish & Game, and RWQCB. The project was completed in 2003.

University Sports Complex, California Polytechnic State University
San Luis Obispo, California

University Sports Complex, California Polytechnic State University

Cannon Associates provided engineering design and surveying services for the construction of a new $9 million, 47-acre sports complex at California Polytechnic State University. The complex contains a baseball stadium and softball stadium, playing fields for intramural sports, concession areas, restrooms and parking. Site planning included a NCAA football stadium and field house, which have not been built. Cannon Associates was responsible for preliminary site planning and preparing and specifications for grading, sewer, water and storm drain systems, utilities, street improvements and parking. Cannon Associates also provided surveying services including aerial, topographic and boundary surveys.

Davidson Library Boiler Replacement
UCSB, Santa Barbara, California

Davidson Library Boiler Replacement, UCSB, Santa Barbara, California

The Davidson Library at UCSB was in need of new boilers and associated pumps and piping. The boilers heat the two-story section (Library 4) and the four-story section (Libraries 1 and 2). The existing boilers had been in use since 1977. UCSB selected Cannon Associates to provide the engineering services for the HVAC design and construction administration/observation. The scope of work for this project included preparation of plans, specifications, and opinions of probable cost and timeline for the replacement of the existing Cleaver Brooks hot water boilers (two), Weinman double suction circulating pumps (three), vent stack (one), and associated circulation piping. It also included preparation of heat load calculation to size the new units. Cannon Associates also provided construction administration on a weekly basis.

Kermit King Elementary School
Paso Robles, California

Kermit King Elementary School, Paso Robles, California

Kermit King Elementary School is located among the rolling hills and bountiful vineyards of Paso Robles, California. Set on a bluff adjacent to the Salinas River, this K-5 elementary school provides an educational facility for more than 450 north county youth. This new school site consists of seven buildings (approximately 20,000 square feet), three baseball fields, and two football/soccer fields on 10 acres. It is located immediately west of the Cuesta College North County Campus site. Cannon Associates was selected to provide civil engineering, planning, and surveying for the project. The scope of work included the preparations of plans, specifications and estimates of probable costs for grading, drainage, sewer, water, and storm drain systems, street improvements for all interior street, parking lots and utilities. Cannon Associates also prepared the boundary and topographic surveys, and construction surveys.


Home | Services | Projects | About Cannon | Career Opportunities
California Polytechnic State University
  • 2700-Bed Student Housing North Complex *
  • Engineering IV Building *
  • EDES South Building *
  • Sports Complex *
  • 800-Bed Student Housing, Phase I *
  • Bonderson Senior Project Building
  • Parking Garage
  • Utilidor Project
  • Water Transmission Line
  • Foundation Warehouse
  • Engineering East
  • Foundation Administration Building
  • Dairy Science Buildings I and II
  • Poultry Unit Site C-51


  • University California Santa Barbara
  • Davidson Library Boiler Replacement


  • Cuesta College
  • Allied Health/Math/Science Building*
  • Learning Resources Center
  • Master Planning and EIR *
  • New Library
  • Learning Resource Center *


  • Westmont College
  • Campus Firewater Study
  • Campus Water Main Modification


  • Panama-Buena Vista Union School District
  • Laurelglen Elementary School
  • Leo B. Hart Elementary School
  • Tevis Junior High School
  • Hosking Akers Junior High School *
  • Sing Lum Elementary School
  • Van Horn Elementary School
  • Thompson Junior High
  • District Fuel System Retrofit


  • Richland Union School District
  • Sequoia Elementary School *
  • Redwood Elementary School


  • Tehachapi Unified School District
  • District Fuel System Retrofit


  • Mojave Unified School District
  • Hacienda Elementary School *


  • Taft School District
  • Parkwood Elementary School
  • Taft Primary School
  • City of Taft Interim School


  • Kernville Union School District
  • Woodrow Wallace School


  • Bakersfield City Schools
  • Carline Harris Elementary


  • Fruitvale Union School District
  • Endeavor Elementary School *


  • Kern County Superintendent of Schools
  • Richardson Center- M.O.V.E.
  • Southeast Career Center *


  • Santa Rita School District
  • McKinnon Elementary School *
  • Santa Rita Elementary School
  • Rogge Road Elementary School *
  • MOT Facility *


  • Calaveras Unified School District
  • Jenny Lind Elementary School *
  • Head Start Program Building
  • Jenny Lind Continuation High School


  • Scotts Valley Unified School District
  • Scotts Valley High School *


  • Konocti Unified School District
  • Walnut Elementary School


  • Paso Robles Public Schools
  • Kermit King Elementary School *
  • Paso Robles High Culinary Arts Academy
  • Paso Robles High School
  • Flamson Middle School
  • Virginia Petersen Elementary School
  • Georgia Brown Elementary
  • Glen Speck Elementary Head Start Building


  • Atascadero Unified School District
  • Atascadero High School *
  • Atascadero Junior High School
  • District Administration Building
  • San Gabriel Elementary School *
  • San Benito Elementary School *
  • Del Rio Junior High School **
  • Santa Margarita Elementary School
  • Creston School
  • Atascadero High School Track & Field *


  • San Luis Coastal Unified School District
  • Laguna Middle School
  • Pacific Beach Continuation High School *
  • Morro Bay High School Tennis Courts *
  • San Luis Obispo High School Tennis Courts


  • Santa Maria Bonita School District
  • Ida Taylor Elementary School **
  • Liberty II Elementary School **
  • Preisker Junior High School *
  • Adams Elementary School *
  • Rice Elementary School *
  • Bonita Elementary School
  • Oakley Elementary School
  • Ontiveras Elementary School
  • Bruce Elementary School


  • Templeton Unified School District
  • District Offices
  • New Administration Building *
  • Templeton High School
  • Templeton Elementary School


  • Pleasant Valley School District
  • Monte Vista Middle School *
  • Dos Caminos Elementary
  • Tierra Linda Elementary
  • La Mariposa Elementary *
  • Santa Rosa Elementary


  • Oxnard Unified School District
  • Headstart Center, Haydock School


  • Lucia Mar Unified School District
  • Arroyo Grande High School Track *
  • Paulding Middle School *
  • * New School and/or Major Facility Expansion
    ** Facility designed but never constructed.


    © Copyright 2000-2003. Site designed by Webeclectic.
                "Providing the Elegant Solution" is a service mark of Cannon Associates.
    Cannon Associates - Civil Engineering, Mechanical Engineering, Structural Engineering, Electrical Engineering, Planning, Surveying