2,700-Bed Student Housing North Complex
San Luis Obispo, California
Cal Poly's Master Plan (adopted in March 2001) calls for the construction of residential communities to more than double housing available for students living on campus. The Student Housing North Complex will be the largest single construction project in the history of the CSU system at $299 million in bonds. This 2,700-bed housing complex will include three residential neighborhood areas on 30 acres north of Brizzolara Creek. The size of this project offers Cal Poly a unique opportunity to create a twenty-first century living and learning community. Its program components and physical design can embody the key values of the Cal Poly Master Plan, particularly with respect to establishing an atmosphere that is student-centered, stimulating, socially supportive and environmentally responsible. The complex includes two parking structures totaling 1,900 parking spaces, commercial areas with retail and food service space as well as a recreation center with a swimming pool. The apartment units will offer full kitchens, laundry areas, study areas, utilities including high-speed internet access. The design team, headed by Clark Construction, was awarded this project as the result of a design/build competition. Cannon Associates was chosen to provide civil engineering services for the project. The scope of work includes the preparation of grading, drainage, improvement, and on-and off-site utility plans. Cannon Associates will also assist with environmental permitting and achieving LEED certification for the complex. The project is scheduled to begin in late fall 2005 and will open in two phases beginning in 2008.
For up to the minute coverage of the construction site, click here
Cal Poly Student Housing Project
San Luis Obispo, California
With hundreds of new students on the California Polytechnic State University campus each year, this 200-room/800-bed student housing facility was in high demand. Constructing 29 buildings and a commons building on a steep hillside in San Luis Obispo created design challenges. The final design incorporated the surrounding natural landscape with stepped foundations and retaining walls to minimize site disturbance. Cannon Associates was selected to provide civil and structural engineering, surveying, and permitting services to the project architect. The scope of work included plans, specifications, and cost estimates for grading, drainage, an on-site storm water detention basin, hot and cold water systems for heating and cooling, plans and specifications for street improvements; including parking along the street, curb, and gutter, and plans specifications and calculations for twelve foot headwalls needed to support the street improvements. Additionally, Cannon Associates prepared structural design for stepped foundations and retaining walls to mitigate the site’s steep terrain; along with designs of concrete abutments for a 32-foot by 6-foot concrete and steel pedestrian bridge; a topographic survey; and permit processing and coordination with Army Corps, Fish & Game, and RWQCB. The project was completed in 2003.
University Sports Complex, California Polytechnic State University
San Luis Obispo, California
Cannon Associates provided engineering design and surveying services for the construction of a new $9 million, 47-acre sports complex at California Polytechnic State University. The complex contains a baseball stadium and softball stadium, playing fields for intramural sports, concession areas, restrooms and parking. Site planning included a NCAA football stadium and field house, which have not been built. Cannon Associates was responsible for preliminary site planning and preparing and specifications for grading, sewer, water and storm drain systems, utilities, street improvements and parking. Cannon Associates also provided surveying services including aerial, topographic and boundary surveys.
Davidson Library Boiler Replacement
UCSB, Santa Barbara, California
The Davidson Library at UCSB was in need of new boilers and associated pumps and piping. The boilers heat the two-story section (Library 4) and the four-story section (Libraries 1 and 2). The existing boilers had been in use since 1977. UCSB selected Cannon Associates to provide the engineering services for the HVAC design and construction administration/observation. The scope of work for this project included preparation of plans, specifications, and opinions of probable cost and timeline for the replacement of the existing Cleaver Brooks hot water boilers (two), Weinman double suction circulating pumps (three), vent stack (one), and associated circulation piping. It also included preparation of heat load calculation to size the new units. Cannon Associates also provided construction administration on a weekly basis.
Kermit King Elementary School
Paso Robles, California
Kermit King Elementary School is located among the rolling hills and bountiful vineyards of Paso Robles, California. Set on a bluff adjacent to the Salinas River, this K-5 elementary school provides an educational facility for more than 450 north county youth. This new school site consists of seven buildings (approximately 20,000 square feet), three baseball fields, and two football/soccer fields on 10 acres. It is located immediately west of the Cuesta College North County Campus site. Cannon Associates was selected to provide civil engineering, planning, and surveying for the project. The scope of work included the preparations of plans, specifications and estimates of probable costs for grading, drainage, sewer, water, and storm drain systems, street improvements for all interior street, parking lots and utilities. Cannon Associates also prepared the boundary and topographic surveys, and construction surveys.
Home |
Services |
Projects |
About Cannon |
Career Opportunities
|
 |
California Polytechnic State University
2700-Bed Student Housing North Complex *
Engineering IV Building *
EDES South Building *
Sports Complex *
800-Bed Student Housing, Phase I *
Bonderson Senior Project Building
Parking Garage
Utilidor Project
Water Transmission Line
Foundation Warehouse
Engineering East
Foundation Administration Building
Dairy Science Buildings I and II
Poultry Unit Site C-51
University California Santa Barbara
Davidson Library Boiler Replacement
Cuesta College
Allied Health/Math/Science Building*
Learning Resources Center
Master Planning and EIR *
New Library
Learning Resource Center *
Westmont College
Campus Firewater Study
Campus Water Main Modification
Panama-Buena Vista Union School District
Laurelglen Elementary School
Leo B. Hart Elementary School
Tevis Junior High School
Hosking Akers Junior High School *
Sing Lum Elementary School
Van Horn Elementary School
Thompson Junior High
District Fuel System Retrofit
Richland Union School District
Sequoia Elementary School *
Redwood Elementary School
Tehachapi Unified School District
District Fuel System Retrofit
Mojave Unified School District
Hacienda Elementary School *
Taft School District
Parkwood Elementary School
Taft Primary School
City of Taft Interim School
Kernville Union School District
Woodrow Wallace School
Bakersfield City Schools
Carline Harris Elementary
Fruitvale Union School District
Endeavor Elementary School *
Kern County Superintendent of Schools
Richardson Center- M.O.V.E.
Southeast Career Center *
Santa Rita School District
McKinnon Elementary School *
Santa Rita Elementary School
Rogge Road Elementary School *
MOT Facility *
Calaveras Unified School District
Jenny Lind Elementary School *
Head Start Program Building
Jenny Lind Continuation High School
Scotts Valley Unified School District
Scotts Valley High School *
Konocti Unified School District
Walnut Elementary School
Paso Robles Public Schools
Kermit King Elementary School *
Paso Robles High Culinary Arts Academy
Paso Robles High School
Flamson Middle School
Virginia Petersen Elementary School
Georgia Brown Elementary
Glen Speck Elementary Head Start Building
Atascadero Unified School District
Atascadero High School *
Atascadero Junior High School
District Administration Building
San Gabriel Elementary School *
San Benito Elementary School *
Del Rio Junior High School **
Santa Margarita Elementary School
Creston School
Atascadero High School Track & Field *
San Luis Coastal Unified School District
Laguna Middle School
Pacific Beach Continuation High School *
Morro Bay High School Tennis Courts *
San Luis Obispo High School Tennis Courts
Santa Maria Bonita School District
Ida Taylor Elementary School **
Liberty II Elementary School **
Preisker Junior High School *
Adams Elementary School *
Rice Elementary School *
Bonita Elementary School
Oakley Elementary School
Ontiveras Elementary School
Bruce Elementary School
Templeton Unified School District
District Offices
New Administration Building *
Templeton High School
Templeton Elementary School
Pleasant Valley School District
Monte Vista Middle School *
Dos Caminos Elementary
Tierra Linda Elementary
La Mariposa Elementary *
Santa Rosa Elementary
Oxnard Unified School District
Headstart Center, Haydock School
Lucia Mar Unified School District
Arroyo Grande High School Track *
Paulding Middle School *
* New School and/or Major Facility Expansion
** Facility designed but never constructed.
|
|
 |